Latest posts
-
Utica shale pipeline commissioning: wet gas and liquids lines
Utica development brings wet gas and NGL gathering into the same corridors as dry transmission. What that means for test medium, drying criteria and records.
-
Pipeline testing in the Bakken: cold weather changes the analysis
Below about 39 degrees F the thermal expansion of water approaches zero, which changes pressure-temperature analysis. Freeze protection and winter test planning.
-
Pipeline pressure testing in western Pennsylvania and the tristate area
Hydrostatic testing, pigging and nitrogen services across western Pennsylvania, Ohio and West Virginia, and the training built on that field experience.
-
Nitrogen services in the Permian: where water is the constraint
In arid basins the water programme often costs more than the test. Where nitrogen makes sense as a test and commissioning medium, and how inventory is calculated.
-
Hydrostatic testing in the Marcellus: terrain is the constraint
Marcellus gathering and transmission lines run over steep Appalachian terrain, which drives segment breaks, water logistics and winter test planning.
-
Haynesville and Gulf Coast: humidity, heat and drying acceptance
High ambient humidity and heat change the drying phase and the dew point margin. What that means for acceptance criteria and schedule on Gulf Coast lines.
-
Appalachian Basin commissioning and decommissioning work
Bringing lines into service and taking them out across the Appalachian Basin: the sequence, the records, and where decommissioning differs from commissioning.