Pigging Operations
Launcher and receiver setup, and proving isolation before you open
Procedures are written in the names of the parts. Learn the anatomy, because a procedure you cannot read precisely is a procedure you will improvise around.
The anatomy
A trap and its mainline connections comprise, in the order they matter:
- The closure, or door
- The oversized trap barrel
- The reducer to the nominal-bore section
- The trap isolation valve
- The mainline valve, operated per procedure
- The kicker valve
- The vent
- The drain, to safe containment
- The pig signaller
The barrel is oversized so the pig can be loaded and then driven forward into the nominal bore where its seals engage.
Launching
The pig is loaded, the closure secured, the trap equalised and the isolation valve opened. The kicker introduces flow behind the pig to move it out of the oversized barrel and into the bore; the mainline valve position determines where the flow goes.
A pig that will not leave the trap is almost always a flow-path problem at the kicker, not a pig problem.
Receiving
Receiving is the same in reverse, with one addition: the trap now contains whatever the pig has pushed ahead of it. Debris, liquid and, on a gas line, potentially a hydrocarbon inventory.
The signaller confirms arrival. Confirmation of arrival is not confirmation that the trap is safe to open.
Proving isolation, and never from one indication
Before a closure is opened, three things must be proved: that the trap is isolated from the line, that it is depressurised, and that it is drained to safe containment.
Each must be proved independently, and none from a single indication. A closed valve is not proof of isolation; a gauge reading zero is not proof of depressurisation, because a gauge can be isolated, blocked or wrong.
Working it with hardware in the room
This section is taught on the two-day field certification with equipment displays, because the names and the sequence stick when the parts are in front of you.
It is Plate III and Chapter 4.3 in the field book.